IEC TR 61010:32003 pdf download.Safety requirements for electrical equipment for measurement, control, and laboratory use
I Scope
This part of IEC 61010 is a technical report, which provides a test protocol to assist with determining and recording verification of conformity of the equipment under test with the reference documents identified on the front cover of the appropriate report.
2 General
Conformity verification reports (CVRs) should only be used with the appropriate standards.
Individual report layouts reflecting the referenced documents are presented for each part of the IEC 61010 series in the form of a check list, together with the forms (where required) for reflecting the results of tests. Key words or phrases of the appropriate standard(s) are mainly used, but in order to understand the full details of the requirements to be met when using a CVR, it is essential that test personnel refer to the appropriate standard(s). Where any doubts arise, the requirements of standards take preference over the text of CVRs.
The part 2 standards indicate in their forewords which amendments (if any) are applicable to IEC 61010-1: 2001 2td edition.
Care should be taken to ensure that any potentially destructive testing is performed last in the sequence of testing, as determined by the tester.
Clauses or subclauses which are not applicable need not be included in the prepared report, provided that these omissions are indicated in the contents list of the report. An example of a contents list based on IEC 61010-1: 2001 is given in Annex A for a report on a specific product.
3 Applicability of conformity verification reports
3.1 CVR for IEC 61010-1: 2001, 2nid edition IEC 61010-3-1: 2003 for:
a) IEC6IOIO-1:2001
or
b) IEC 61010-1: 2001 + amendment 1: (in preparation)
3.2 CVRs for part 2 standards with cross-references to IEC 6101 0-1: 2001 - 2’ edition
a) IEC 61010-3-010 for IEC 6101 0-2-010. (standard in preparation);
b) IEC 61010-3-020 for IEC 61010-2-020. (standard in preparation);
c) IEC 61010-3-051 for IEC 61010-2-051. (standard in preparation);
d) IEC 61010-3-061 for IEC 61010-2-061. (standard in preparation);
4 Documents
The documents a) to d), together with any others required by the standard, should be reviewed and listed in the report:
a) general description of the equipment tested;
b) OPERATOR instructions;
c) installation instruction;
d) service instructions.
The documents e) to n), if applicable, should also be listed in the report:
e) component data sheets and certification details;
f) wire data sheets;
g) flammability test results or data sheets;
h) enclosure flammability test results and/or material data sheets;
i) comparative tracking indices of printed wiring board materials;
j) data sheets, test results or certification details for cathode-ray tubes;
k) constructional drawings and specifications for transformers including winding and insulation details;IEC TR 61010 pdf download.